    济南卷帘门施工工艺程序
    来源:http://www.jnjqjc.com   时间:2014-2-26 11:06:19

    目前的卷帘门发展速度较快,单一色调的卷帘门已经不能够满足消费者的需求,多样化的卷帘门开始走进大众的视野,满足大众的需求。
    The current shutter speed faster, a single color of shutter already cannot satisfy the needs of consumers, a variety of doors began to come into the mind of the public, meet the needs of the most popular.
    济南卷帘门:http://www.jnjqjc.com/
    Jinan shutter
    1.卷帘门施工工艺程序
    1. Book door construction technology program
      (1)手动卷帘门工艺程序:定位、放线一安装卷筒一安装手动机构一帘板与卷筒连接一安装导轨一试运转一安装防护罩。
    (1) manual shutter process: positioning, pay-off installed a drum a manual institutions a curtain plate connected to the drum installed a guide rail, a test run a shield.
      (2)电动卷帘门工艺程序:定位、放线_安装卷简一安装电机、减速器一安装电气控制系统一空载试车一帘板与卷筒连接_安装导轨一安装水幕喷啉系统一试运转一安装防护罩。
    (2) electric shutter process: positioning, pay-off installed _ roll Jane a motor, reducer a installation of electrical control system a no-load test run a curtain plate connected to the drum _ installation guide a water curtain a drenching system test run the install shield.
      2.定位放线卷帘门安装方式有洞内安装、洞外安装、洞中安装三种。即卷帘门装在门洞内,帘片向内侧卷起;卷帘门装在门洞外,帘片向外卷起和卷帘门装在门洞中,帘片可向外侧或向内侧卷起。因此,定位放线时应根据设计要求弹出两导轨垂直线及卷简中心线并测量洞口标高。定位放线后,应检查实际预埋铁件的数量、位置与图纸核对,如不符合产品说明书的要求,应进行处理。
    2. Locate pay-off book door installation are installed inside the hole, hole, hole in three kinds of installation. The shutter is installed in the doorway, the slice to the inside of the roll up; Book door is installed outside the door, the slice up and outward doors in the doorway, the slice to the lateral or to the inside of the roll up. Therefore, positioning steel should be according to the design requirements when the pop-up two guide rail vertical line and roll Jane the centerline and elevation measurement hole. After positioning, pay-off, should check the actual embedded iron, location and the number of drawings to check, if you don't meet the requirements of the product manual should be handled.
      3.安装卷筒安装卷筒时,应使卷筒轴保持水平,并使卷筒与导轨之间距离两端保持一致,卷筒临时固定后进行检查,调整、校正合格后,与支架预埋铁件用电焊焊牢。卷筒安装后应转动灵活。
    Installed 3. Drum drum, the drum shaft should be level, and consistent on both ends of the distance between the drum and the guide rail, drum temporary fixed after inspection, adjustment and calibration qualified, and stents in embedded iron welding weld. Reel should be flexible rotation after installation.
      4.帘板安装帘板事先装配好,再安装在卷筒上。门帘板有正反向,安装时要注意,不得装反。
    4. The curtain plate curtain installation board assembled in advance, then installed on the drum. Door curtain plate to the positive and negative, when installation should pay attention to, may not be installed backwards.
      5.安装导轨按图纸规定位置线找直、吊正轨道,保证轨道槽口尺寸准确,上下一致,使导轨在同一垂直平面上,然后用连接件与墙体上的预埋铁件焊牢。
    5. Installation guide line of position for straight as stipulated in the drawings, condole is orbit, guarantee the accuracy of the rail slot size, consistent, the guide in the same vertical plane, and then using the embedded iron welding on the fitting with the wall.
      6.安装水幕喷淋系统防火卷帘门应安装水幕喷淋系统。水幕喷淋系统,应与总控制系统连接。安装后,应试验。
    6. Installation of water curtain spray system fire shutter should install the water curtain spray system. The water curtain spray system, should with the total control system connection. After installation, test.
      7.试运转先手动试运行,再用电动机启闭数次,济南卷帘门调整至无卡住、阻滞及异常噪声等现象为合格。
    7. Commissioning manual test run first, motor open/close several times again, jinan book door adjustment to get stuck, block and abnormal phenomenon such as noise is qualified.