    济南卷帘门安装要求及质量控制
    来源:http://www.jnjqjc.com   时间:2014-9-29 11:16:09
    以下是济南卷帘门的安装要求及质量控制要点的介绍,
    The following is the Ji'nan rolling shutter door installation requirements and main points of quality control is introduced,
    安装卷帘门的洞口上部不得设有通风管、水管等;卷帘门安装好后,安装吊顶,吊顶边缘应离帘板50mm,以免摩擦;调试及使用时,严禁底部 站人。电器设施不得擅自拆搬。
    Installation book door hole shall be provided with ventilation pipe, pipe; rolling door installation, installing a suspended ceiling, ceiling edge should be from the curtain plate 50mm, so as to avoid friction; debugging and use, no bottom station. Electrical facilities and move without authorization.
    根据消防管理规定,防火卷帘门安装施工质量控制要点;复核洞口尺寸与产品尺寸是否相符,测量洞口标高,弹出导轨垂线即卷筒中心线;固定卷筒、传动装置,卷筒安装应转动灵活;先手动试运行,再用电动机启闭数次,调整至无卡住、阻滞及异常噪声,启闭数度符合要求,全部调试完毕,才可安装防护罩。
    According to the fire protection management regulations, fire shutter door installation construction quality control points; check the size and product size is consistent, measuring the elevation, pop-up rail vertical namely drum center line; fixed drum, drum transmission device, the installation should be flexible rotation; the starting dynamic test run, and then the motor hoist several times, to no jamming, block and abnormal noise, opening and closing number degree meets the requirement, all finished debugging, to install the protective cover.